Posted By David/ Friday, February 3, 2017

VIDEO: Bolivar Beach and Dune Restoration Project From Above.

The rebuilding is underway in sections, here's a look from above from Bolivar LIVE!

Bolivar LIVE is above the new Bolivar Peninsula Beach and Dune Restoration Project today. An aerial flyover a finished section close to Rollover Pass.

Comments

Add Your Comment

Thank you for posting your comments. We will review them shortly and add them to our blog!

Latest Posts

Posted 4/28/2025/By David
Surface water temperature 7 7 degrees.
Posted 4/22/2025/By David
Surface water temperature 76 degrees.
Posted 4/17/2025/By David
Surface water temperature 74 degrees.
Posted 4/14/2025/By David
Escape to the Texas coast for the perfect weekend getaway on Bolivar Peninsula. With beautiful beach
Posted 4/14/2025/By David
Today, we're at the iconic Rollover Bay, diving into its rich history and showcasing the incredible