Building It Taller With Another Pour On Bolivar Peninsula.
Posted By David/ Tuesday, November 23, 2021

Building It Taller With Another Pour On Bolivar Peninsula.

The old Water Tower came down quickly and the new super-sized is building back in a timely manner so far. We caught them pouring another ring yesterday, with cement trucks lined up, the pumped the cement to the top and set another ring on the towner to come. BTYB: www.BolivarPeninsulaRentals.com #beachhouserentals #texas #bolivarpeninsula #crystalbeachtx #tourism #travelblogger #beachvacations #bolivarlive

Add Your Comment

Thank you for posting your comments. We will review them shortly and add them to our blog!

Latest Posts

Posted 4/28/2025/By David
Surface water temperature 7 7 degrees.
Posted 4/22/2025/By David
Surface water temperature 76 degrees.
Posted 4/17/2025/By David
Surface water temperature 74 degrees.
Posted 4/14/2025/By David
Escape to the Texas coast for the perfect weekend getaway on Bolivar Peninsula. With beautiful beach
Posted 4/14/2025/By David
Today, we're at the iconic Rollover Bay, diving into its rich history and showcasing the incredible